Buy DD101 LONG LEAD NSN Part of Crl Components Inc
Part Number: DD101 LONG LEAD |
Manufacturer: Crl Components Inc |
Alternate P/N : DD101LONGLEAD |
NSN : 5910-00-678-8157 |
NIIN : 006788157 |
Item Name : Capacitor Fixed Cer |
CAGE Code : 71590 |
FSC: 5910 Capacitors |
Part number DD101 LONG LEAD with NSN 5910006788157 is now available in our inventory and ready for shipping. This DD101 LONG LEAD NSN part is manufactured by Crl Components Inc with cage code 71590. Would you like to receive the best quote for this part now? All you have to do is fill out the form.
There are many important fields in the form, like Need Parts By and Quantity (ea). Please make sure that you enter the correct details in these fields as they will determine your quote amount for Crl Components Inc NSN part DD101 LONG LEAD. One of our sales representatives should get back to you with the best possible quote in 15 minutes or less.
NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Cer | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Dd101 Long Lead | 1 | 1 | C | A |
Characteristics Data of NSN 5910-00-678-8157, 5910006788157
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
- All parts are Stocked in the USA
- All parts are Shipped from the USA
- All Shipments must comply with U.S.A Export Laws
- No Exceptions
Frequently SearchedNSN
Premium NSN Components
Brakesingle Disk |
Studlocked In |
Cylinder Hydraulic Master |
Switchfoot |
Valve Wheel Ctis |
Filterfluid |
Sign Exit Vertical |
Cellbattery |
Rivet Blind Universal Head |
Tableoffice |
Why Choose Us?
Low Price
Warrantied inventory at competitive prices
Find it fast
Search the world's largest inventory of electronic components by manufacturer, category or part number
Quality guaranteed
We sell only warrantied and traceable parts
Get it fast
All inventory ready to ship from our sellers